|
Insert Equipment |
Top Previous Next |
|
To create a piece of equipment, go to DM Electrical The Equipment dialog box will appear.
Press the Insert New button. The New Equipment dialog box will appear.
Enter the callout for the piece of equipment, then press OK. Design Master will take you to the drawing and ask you to specify where you want the equipment inserted. Place both the equipment and the associated callout label. (Because each piece of equipment is unique, it is necessary to place the equipment on the drawing to save it in the database.) The program will then bring you back to the Equipment dialog box. At this point you may define the equipment using the following fields.
Press the Save button to keep this definition, then press Exit to return to the drawing, or Insert New to create a new piece of equipment. Design Master does not include an option to create an equipment schedule. *For the four loads on the equipment, Design Master uses the value in the Connected KVA field. When the user selects a horsepower, Design Master calculates the corresponding Connected KVA based upon NEC Tables 430-18 and 430-150. When a new horsepower is selected, DM will calculate a new KVA.After selecting the HP, the user can override the value in the Connect KVA field if necessary. Design Master does not update the horsepower field when the KVA is overridden. |
| Page url: http://www.designmaster.biz/support/electrical/documentation/index.html?equipment_insert_equipment1.htm |