Schedules

This section describes the options available in the Schedules group in the Design Master Electrical Options dialog box.

Customization--Options.Edit Project List.Schedules

Show unused receptacles in schedule: Specifies whether unused receptacles are displayed in the receptacle schedule. This can also be set when inserting the receptacle schedule. This option can be used in the Standards database to set the default value for new projects.

Show unused fixtures in schedule: Specifies whether unused light fixtures are displayed in the receptacle schedule. This can also be set when inserting the light fixture schedule. This option can be used in the Standards database to set the default value for new projects.

Show equipment Not inserted on a drawing: Specifes whether equipment that is in the database but not on a drawing is displayed in the equipment schedule. This can also be set when inserting the equipment schedule. This option can be used in the Standards database to set the default value for new projects.

Schedule title justification: The justification for the title at the top of all the schedules.

Left: The schedule title is justified to the left.
Center: The schedule title is centered.

Schedule column label justification: The justification for the label at the top of each column in all of the schedules.

Left: The column labels are justified to the left.
Center: The column labels are is centered.

Schedule title continued label: The text in this option is added to the schedule title when the schedule is broken into multiple sections.

When inserting schedules, there is an option to set a maximum height for the schedule. If the schedule exceeds this height, the schedule is continued in a second section next to the first. The title of the second and following sections is the schedule title plus the text in the Schedule title continued label option.