Update One-Line Device Schedule

Design Master Electrical does not automatically update the one-line device schedules when changes are made to the drawing. You must manually update the schedules before plotting to ensure the schedules reflect the most recent changes. To update a one-line device schedule, go to

DM Electrical->One-Line Schedules->Update One-Line Device Schedule

You will be prompted to identify which schedules are to be updated.

Select panel schedules to update:

Select all the schedules that need to be updates and press ENTER.

The dialog box below will appear, asking "Recalculate loads between one-line devices?"

One-Line Schedules--Design Master Recalculate Load dialog box

Yes: All of the values on the one-line device schedules will be recalculated. You are guaranteed to have the latest information in your schedules. All of the load totals for the one-line device, include loads transferred from one-line devices connected to it, are recalculated.

No: The values from the most recent calculation will be used. This selection allows you to save time if you know that you recently ran these calculations and have not made any changes that might affect them.

After you answer the prompt on the dialog box, all of the one-line devices schedules you selected will be updated.