Feeder

Creates a schedule called FEEDER SCHEDULE and sets it to the active view. If a schedule of that name already exists, this command sets the schedule to the active view but does not otherwise modify it.

The first time this command is run, you will be asked whether to include an additional column for second feeders:

create-feeder-schedule-dialog-box

If you select No, include just one feeder column, you can add the second column later by running the Revit Insert command and adding the "DMET_Feeder2_WireCallout" shared parameter. See the Schedule Fields / Shared Parameters section for more information.

The default schedule layout is shown below. Each piece of distribution equipment in the project is listed with its corresponding feeder size. The distribution equipment is grouped by the ampacity of the upstream OCP.

Once the schedule is created, you can modify it using standard Revit tools.

feeder-schedule

Related Options

Output shared parameter values as uppercase: Sets whether shared parameter outputs are displayed only in uppercase letters.


Page url: http://www.designmaster.biz/docs/elecrt/2.0/index.html?feeder.htm
©2013-2021 Design Master Software, Inc