Arc-Flash

Creates a schedule called ARC-FLASH SCHEDULE and sets it to the active view. If a schedule of that name already exists, it sets it to the active view but does not otherwise modify it.

The default schedule layout is shown below. It lists each piece of electrical equipment in the project and information about the arc-flash. The devices are listed in "tree order" based upon the connections between devices in the model.

Once the schedule is created, you can modify it using standard Revit MEP tools.

arc-flash-schedule


Page url: http://www.designmaster.biz/docs/elecrt/index.html?arc_flash.htm
©2013-2017 Design Master Software, Inc