Edit Room Air Balance Report List

To edit the room air balance report list, go to

DM HVAC->Customization->Labels and Schedules->Project List->Edit Room Air Balance Report List

or

DM HVAC->Customization->Labels and Schedules->Standards and Master Lists->Edit Room Air Balance Report List

Room Air Balance Report Label Display and Order Dialog Box

Customization--Labels.Edit Room Air Balance Report Project List dialog box

See the Common Label and Schedule Information section for more information on using the Move Up and Move Down buttons and the Key, Label, Width, Display, and Schedule Title fields.

Area: The area of the room, measured in square feet.

Ceiling Height: The height of the ceiling in the room.

Exhaust CFM: The volume of air exhausted from the room. Based upon the airflow of the exhaust diffusers inserted in the room on the drawing.

OSA Air Changes / Hour: The ventilation air changes per hour required in the room.

OSA CFM Required: The total ventilation airflow required in the room

OSA Percentage Required: The percentage of supply air that needs to be ventilation air.

Overall AC / Hour: The total number of air changes per hour required in the room.

Pressurization: The pressurization in the room equal to the supply airflow minus the return airflow and exhaust airflow.

Return CFM: The volume of air return from the room. Based upon the airflow of the return diffusers inserted in the room on the drawing.

Room Number: The room number for the room. See the Edit Rooms section for more information.

Room Name: The type of the room, taken from the Room Project Schedule. See the Edit Rooms section for more information.

Supply CFM: The volume of air supplied to the room. Based upon the airflow of the supply diffusers inserted in the room on the drawing.

Volume: The volume of the room.


Page url: http://www.designmaster.biz/docs/hvac/index.html?edit_room_air_balance_report_list.htm
©2012-2013 Design Master Software, Inc