Print Project Info

The section describes what is printed when Print Project Info is checked in the Print Load Calculations dialog box.

Load Calculations--Print Load Calculations.Project Info

Project Information

The Project Information table lists general information about the project. Most of the values are set in the Project Info command.

project-information

Project Name: Set using the Project Name field in the Project Info command.

Project Location: Set using the City field in the Project Info command.

Default Heating Temperature: The heating temperature in the default zone in the project.

To set this value, go to the Project Info command. Press the Edit Default Zone Information button. Then set the Heating Temperature for the zone that is displayed.

Default Cooling Temperatures: The cooling temperature in the default zone in the project.

To set this value, go to the Project Info command. Press the Edit Default Zone Information button. Then set the Cooling Temperature for the zone that is displayed.

Default Relative Humidity: The relative humidity in the default zone in the project.

To set this value, go to the Project Info command. Press the Edit Default Zone Information button. Then set the Relative Humidity for the zone that is displayed.

Calculation Date: The date and time that the report was printed.

Heating Safety Factor (Room): Set using the Heating Safety Factor--Room field in the Project Info command..

Heating Safety Factor (Ventilation): Set using the Heating Safety Factor--Ventilation field in the Project Info command.

Cooling Safety Factor (Room): Set using the Cooling Safety Factor--Room field in the Project Info command.

Cooling Safety Factor (Ventilation): Set using the Cooling Safety Factor--Ventilation field in the Project Info command.

Floor Slab Heat Loss Coefficient: Set using the Floor Heat Loss Coefficient field in the Project Info command.

Design Conditions

OSA Low: Set using the OSA Low Temperature Dry Bulb field in the Project Info command.

OSA Daily Range: Set using the OSA Daily Range field in the Project Info command.

Latitude: Set using the Latitude field in the Project Info command.

Elevation: Set using the Elevation field in the Project Info command.

OSA High Dry Bulb: A row is listed for each month that is selected in the Project Info command. Set using the OSA High Dry field.

OSA High Wet Bulb: A row is listed for each month that is selected in the Project Info command. Set using the OSA High Wet field.


Page url: http://www.designmaster.biz/docs/hvac/index.html?print_project_info.htm