Free Trial Download and try today

Design Master November 2014 Newsletter

Table of Contents


MEP 3D-BIM Survey Results: Five Years, No Change

The results of our MEP 3D-BIM survey are available on our website. The most notable result about this year’s survey is how little has changed in five years.

Read the complete results article on our website.

Design Master Electrical RT Helps Automate Engineering Design in Revit MEP at BNA Consulting

Drayton Bailey, CTS-D, LEED Green Assoc. became an enthusiastic user of Design Master Electrical during his three-year tenure at EDG Engineering in Salt Lake City, Utah. In 2010, Bailey took a position at BNA Consulting, a leading provider of electrical consulting services based in Salt Lake City.

Read more about BNA Consulting.


Best Support Articles from the November Archives

General

Controlling Ability to Customize Master Schedules
How Floating Licenses Work

HVAC

No Outside Air in Building Load Calculations
Connecting Ducts Between Floors

Electrical

Switch Rotation in Schedules
Updating Homerun Without Loosing Loop Customization
Multiple Circuits Feeding a Piece of Equipment
General Lighting Circuit Calculations
Feeder and Service Calculations
COMcheck Lighting Export