Room Schedules (Project and Master)

Top  Previous  Next

Design Master includes a list of room types with associated definitions useful for calculating indoor foot candle levels.  To create a new room type, you may add a new room type to a specific project or you may add a new room type to the master database, which can then be used by all projects.

To create a new room type, go to

DM ElectricalarrowBuilding DefinitionarrowRoom Project Schedule

The Room Lighting Design Criteria Schedule dialog box will appear.

room_electrical_design_criteria_schedule

Press New to begin creating a room and enter the room definition data to your desired specifications. See the below table for a description of the various fields.

Field

Sets

Workspace Height

This is the elevation of the workspace above the floor level.

Foot Candles Desired

How many foot candles the room needs.

Wall Cavity Reflectance

The reflective value of the walls in the room type.

Effective Ceiling Cavity Reflectance

The reflective value of the ceiling in the room type.

Effective Floor Cavity Reflectance

The reflective value of the floor in the room type.

Dirt Depreciation Factor

Factor by which the photometric calculations are reduced due to dirt in the room.

Lighting Power Density

The watts per square foot allowed in the room.

Illuminance Category

Illuminance categories are taken from the IES Handbook.

 

When you have finished defining a new room type, press Save. The room will now be available to use in your lighting calculations.

To create a new room type in the Master schedule available for use in all projects, go to

DM ElectricalarrowBuilding DefinitionarrowRoom Master Schedule

The Room Electrical Design Criteria Master dialog box will appear.

room_electrical_design_criteria_master

The only difference between the Schedule dialog box discussed above and the Master dialog box is the Import from button at the bottom of the dialog box. When the Schedule dialog box is open, this button imports room definitions from the Master Schedule, and when the Master dialog box is open, this button imports room definitions from the Project Schedule. Each is labeled as such depending on which dialog box is open. See Importing from Another Database and Importing from Master Database for the differences in the function of these buttons.