To edit low voltage device schedule labels, go to DM Electrical First select the low voltage device group you want to edit.
The Group Schedule Label Display and Order dialog box will appear.
Beginning with the row labeled Callout, each row in the Group Schedule Label Display and Order dialog box will correspond to a column in the appropriate group schedule when it is placed on the drawing. To change the label as it will appear in the schedule that is placed on the drawing, double-click on the value you wish to change under the Label column. Type the label as you wish it to appear. To change the width of a specific column, double-click on the cell under the Width column in the row corresponding to the column in the appropriate group schedule that you want to make a new width for. Type in the number in inches for the desired width of the column as it will appear on the drawing when plotted. To indicate whether you wish a specific value to be included in the appropriate group schedule, check or un-check the check boxes under the Display column. To change the order in which the various labels are displayed, use the Move Up or Move Down buttons. The order in which the labels are listed in the Group Schedule Label Display and Order dialog box is the same order they will be displayed on the drawing. If you change the group schedule label display for the entire project after the group schedule has already been placed on the drawing, you will need to run the Insert Low Voltage Device Project Schedule command in order to have the changes reflected on the drawing.
|
| Page url: http://www.designmaster.biz/support/electrical/documentation/index.html?customization_edit_low_voltage_device_schedule_project_list.htm |