All of the default information about a project is stored in two databases, the master database and the standards database. There is one master database. There is at least one standards database, and can be more if necessary.
The standards database stores
The master database stores
| • | Light Fixture Master Schedule |
| • | Receptacle Master Schedule |
When a project is started, everything is copied from the standards database. Most everything is copied from the master database. The light fixture, receptacle, and room schedules are not completely copied. Only the group selected when the project is started is copied.
Later, you can choose to import different schedule groups, either to replace the existing group or add to it.
|