Inserting a Receptacle Schedule

Top  Previous  Next

To insert a receptacle schedule on drawing E0, go to

DM Electrical arrow Receptacles arrow Insert Receptacle Project Schedule

The Insert Receptacle Project Schedule dialog box will open as shown below.

insert_recept_project_sched

Press OK. Design Master Electrical will prompt you to indicate the insertion point for the receptacle schedule. You will click to indicate the location of the upper left-hand corner of the schedule. Place the schedule on the drawing below the light fixture project schedule. Your drawing should look like the one below.

dwg_inserted_recept_sched

The columns that are displayed in the receptacle schedule and their labels can be customized to match your company's standards. Therefore, we will demonstrate how to edit and re-insert the receptacle schedule.


Page url: http://www.designmaster.biz/support/electrical/tutorials/index.html?inserting_a_receptacle_schedul.htm