Add Photometric Calculation Schedule

To add a photometric calculation schedule to a drawing, go to

Ribbon: DM Electrical->Point-by-Point Photometrics-> dm_elec-photo-addSch Add Photometric Calculation Schedule

Pulldown Menu: DM Electrical->Point-by-Point Photometrics->Add Photometric Calculation Schedule

You will be prompted to identify the calculation area boundary to which you want to add a photometric calculation schedule.

Select boundary to add schedule to:

You will then be prompted for the insertion location of the photometric calculation schedule.

Specify insertion point for photometric schedule:

The location you specify will be used as the top-left corner for the photometric calculation schedule.

See the Edit General Photometric Area Schedule List, Edit General Photometric Line Schedule List, Edit Egress Photometric Area Schedule List, and Edit Egress Photometric Line Schedule List sections for more information about editing the photometric schedule layout.

Related Options

Schedule title justification: Sets the justification for the schedule title.

Schedule column label justification: Sets the justification for column headings.

Schedule title continued label: Sets the label added to the schedule title for continued sections.


Page url: http://www.designmaster.biz/docs/elec/index.html?add_photometric_calculation_schedule.htm
©2012-2023 Design Master Software, Inc