Insert Top and Bottom Elevation Label |
Up Previous Next |
The Insert Top and Bottom Elevation Label command is used to insert an elevation label on a conduit or cable tray that displays the elevation of the top and the bottom of the conduit or cable tray. To insert a top and bottom elevation label on a conduit or cable tray, go to Ribbon: DM Electrical->3D-BIM-> Pulldown Menu: DM Electrical->3D-BIM->Insert Top and Bottom Elevation Label You will be prompted to identify which section of conduit or cable tray is to be labeled. Select conduit or cable tray to add elevation label to: You will then be prompted to specify the location of the top and bottom elevation label on the drawing. See the Inserting Notes and Leaders on the Drawing section for more information about inserting the label.
|
Page url:
http://www.designmaster.biz/docs/elec/index.html?insert_top_and_bottom_elevation_label.htm
©2012-2023 Design Master Software, Inc |