Overloaded Distribution Equipment |
Up Previous Next |
When running the Update Distribution Equipment Schedule or Update All Schedules and One-Line Diagram command, if any of the affected schedules show an overloaded distribution equipment, the Overloaded Distribution Equipment dialog box will appear. Overloaded Distribution Equipment Dialog Box All of the overloaded distribution equipment will be displayed in the list, along with the equipment size and the load on the equipment. Edit: Press this button to open the Distribution Equipment Dialog Box for the selected distribution equipment. Overloaded Threshold: The percentage of the load capacity at which the distribution equipment will be considered overloaded. Press the Set Threshold button to modify the threshold value. Ignore Overload on Selected Distribution Equipment: Press this button to remove the selected distribution equipment from the list and stop receiving warnings when it is overloaded. View Ignored Distribution Equipment: Press this button to view distribution equipment for which overload warnings are being ignored. The Ignored Overloaded Distribution Equipment dialog box will appear. Edit: Press this button to open the Distribution Equipment Dialog Box for the selected distribution equipment. Warn on Overload of Selected Distribution Equipment: Press this button to return the selected distribution equipment to the list of overloaded distribution equipment and receive warnings when it is overloaded. Ignore Overload on This Project: Press this button to change the Warn if distribution equipment is overloaded setting in the Options command. Ignore Overload on All Projects: Press this button to change the Warn if distribution equipment is overloaded setting in the User Options command. Finish Command: Press this button to close the dialog box and continue running the command.
|
Page url:
http://www.designmaster.biz/docs/elec/index.html?overloaded_distribution_equipment.htm
©2012-2023 Design Master Software, Inc |