Receptacle Master Schedule

The receptacle master schedule contains the receptacle types that could be used by a company on a project. See the Master and Standards Databases section for more information about using master databases.

To create and modify receptacle types in the master schedule, go to

Ribbon: DM Electrical->Devices-> dm_elec-recMasterSchedule Receptacle Master Schedule

Pulldown Menu: DM Electrical->Receptacles->Receptacle Master Schedule

Receptacle Master Schedule Dialog Box

receptacles--receptacle-master-schedule-dialog-box

See the Common Schedule Dialog Box Features section for more information about how this dialog box works. This section describes the Rename, Find, Previous, Next, New, Copy, Save, and Delete buttons.

See the Common Receptacle Information section for more information about the values that can be specified for receptacles using this dialog box.

See the Import from Project Schedule section for more information about importing receptacles from a project to the master database.

Current Group: The active receptacle group is listed here. All of the receptacle types that are created and modified will be associated with this group.

Select Group: Press this button to open the Receptacle Master Schedule Groups dialog box. The group selected will become the current group. See the Schedule Groups section for more information.

Select Block: Press this button to open the Select Receptacle Block dialog box. This dialog box allows you to choose the block used to represent the receptacle on the drawing.

receptacles--select-receptacle-block-dialog-box

You can add more blocks to this list using the Receptacle Blocks->Edit Master List command.

Related Options

Receptacles options: Set the labels for the receptacle in the project schedule and on the drawing if Explosion-proof, Weather-proof, GFCI, Ground, or Isolated Ground is set to Yes.


Page url: http://www.designmaster.biz/docs/elec/index.html?receptacle_master_schedule.htm
©2012-2023 Design Master Software, Inc