Pipe Symbols |
Up Previous Next |
This section describes the commands used to insert and manage pipe symbols. Common Pipe Symbols Information The values that can be specified for pipe symbols are listed below. Callout: The name of the pipe symbol. Include in Schedule: Whether the pipe symbol is displayed in the pipe symbol project schedule that is inserted on the drawing. Most pipe symbols will have this box checked. Include on Isometric: Whether the pipe symbol is displayed on the isometric drawing. Include on Plan View: Whether the pipe symbol is displayed on the plan view drawing. Schedule Note 1, Schedule Note 2, Schedule Note 3: These notes will appear on the pipe symbol schedule on the drawing. See the Edit Default Schedule Notes section for more information about setting the default values for these notes. |
Page url:
http://www.designmaster.biz/docs/plumb/index.html?pipe_symbols.htm
©2012-2023 Design Master Software, Inc |