Skip to main content

Switch Master Schedule

The switch master schedule contains the switches that could be used by a company in a project. Visit the Master and Standards Databases section for more information about using master databases.

To create and modify switches in the master schedule, go to
Ribbon: DM Electrical→Devices→ Switch Master Schedule icon Switch Master Schedule
Pulldown Menu: DM Electrical→Switches→Switch Master Schedule

Switch Master Schedule Dialog Box

Switches switch master schedule dialog box

Visit the Common Schedule Dialog Box Features section for more information about how this dialog box works. This section describes the , , , , , , , and buttons.

Visit the Common Switch Information section for more information about the values that can be specified for switches using this dialog box.

Visit the Import from Project Schedule section for more information about importing switches from a project to the master database.

  •  Current Group: The active switch group is listed here. All of the switch types that are created and modified will be associated with this group.

  •   Press this button to open the Switch Master Schedule Groups dialog box. The group selected will become the current group. Visit the Schedule Groups section for more information.

  •   Press this button to open the Select Switch Block dialog box. This dialog box allows you to choose the block used to represent the switch on the drawing.

    Switches select switch block dialog box

    You can add more blocks to this list using the Switch Blocks→Edit Master List command.