Pipe Symbols

This section describes the commands used to insert and manage pipe symbols.

Common Pipe Symbols Information

The values that can be specified for pipe symbols are listed below.

  •  Callout: The name of the pipe symbol.

  •  ☐ Include in Schedule Whether the pipe symbol is displayed in the pipe symbol project schedule that is inserted on the drawing. Most pipe symbols will have this box checked.

  •  ☐ Include on Isometric Whether the pipe symbol is displayed on the isometric drawing.

  •  ☐ Include on Plan View Whether the pipe symbol is displayed on the plan view drawing.

  •  Schedule Note 1, Schedule Note 2, Schedule Note 3: These notes will appear on the pipe symbol schedule on the drawing. See the Edit Default Schedule Notes section for more information about setting the default values for these notes.