How to create and manage equipment connections, and how to customize panel schedules, in Design Master Electrical.

 

We look at the following topics for equipment connections:

We look at the following topics for customizing panel schedules:

We also answer the following question:

We also give a brief overview of how the Trace Architect’s <Device Type> commands work (47:55).

Related Articles

Filter by
Post Page
Electrical Electrical Customization Training Recording Electrical Training Distribution Equipment (Panels and Transformers) Circuiting Equipment Connections
Sort by

How to Use or Create a Custom Equipment Callout

You can customize the information displayed in equipment callouts, along with how custom equipment callouts look.

24

Training Recording: Light Fixture, Receptacle, Equipment, and Switch Options

This training video teaches you how to customize light fixtures, receptacles, equipment connections, and switches using the Design Master Electrical Options menu.

24

Training Recording: Distribution Equipment Options

This training video teaches you how to customize distribution equipment using the Design Master Electrical Options menu.

24

Balancing Loads on Switchboards, UPSs, and Other Distribution Equipment

Single-phase loads on non-panel distribution equipment are circuited to phase A by default and must be moved manually to balance the loads.

24

Show NEMA Rating in Equipment Schedule, Not on Drawing

You can specify a NEMA rating that appears in the equipment connection schedule but not in the equipment callout by using a Schedule Notes field instead of the NEMA Rating field.

24

Multiple Circuits Feeding a Piece of Equipment

An equipment connection cannot have more than one circuit feeding it; to model an equipment connection with multiple circuits, you must create multiple pieces of equipment.

24