You are here: Home > MEP Ninja > Solar Panels

Solar Panels

October 12, 2011

Inside the elevator, the ninja sees a camera that he wants to turn off. He shorts out the circuit to the camera, intending to trip the breaker and killing power to the camera. But what happens is that he trips the breaker for the entire building. The elevator comes to a halt and the ninja is trapped.

The name for this scenario is “system coordination.” When an electrical system is coordinated, a short on a small circuit will trip the breaker for that circuit, but not the breakers for the larger circuits. This coordination contains the power outage to a small area in the building.

In this building, the breakers for the elevator were not coordinated. Shorting the small circuit also tripped the main building breaker. As any good electrical engineer knows, the National Electrical Code requires coordinated circuit breakers for elevators in order to avoid the situation the ninja encountered. One can only imagine the desperate fate of the electrical engineer who designed this building when the ninja escapes his new found captivity!

Mark Robison, PE

More Comics

Products

Electrical for Revit

Electrical for AutoCAD

HVAC for AutoCAD

Photometrics for AutoCAD

System Requirements

Support

Contact Support

Install & Update Instructions

Online Training

Knowledge Base

User Manuals

Tutorials

Release Notes

Downloads

Wish List

Remote Support

Company

About

Customer Stories

Awards

Newsletter

Blog

Pricing

Electrical for Revit

Electrical for AutoCAD

HVAC for AutoCAD

Photometrics for AutoCAD

Free Trial

Electrical for Revit

Electrical for AutoCAD

HVAC for AutoCAD

Photometrics for AutoCAD

866-516-9497
8000 Regency Parkway, Suite 585
Cary, NC 27518
[email protected]

©2001-2023, Design Master Software, Inc