You are here: Home > Support > Knowledge Base > NEC 220.55 for Single-Phase Ranges and Three-Phase Service

NEC 220.55 for Single-Phase Ranges and Three-Phase Service

Thursday, December 26th, 2019

Q: My project has single-phase ranges supplied by a three-phase panel. My manual load calculation for the ranges based upon NEC 220.55 doesn’t match Design Master’s calculation. How is the load being calculated?

A: This calculation has several moving parts, including one that is not explicitly mentioned inĀ NEC 220.55 itself but is shown in Annex D, Example D5(a). This article will provide another example with some additional context. Relevant information about the project is as follows:

 

# of Ranges, Phase A-B 28
# of Ranges, Phase B-C 20
# of Ranges, Phase C-A 24
Connected Load per Range 9.1 kVA

To calculate the load:

  1. Find the maximum number of ranges between any two phases.
    In this example, phase A-B has the most ranges at 28.
  2. Multiply that number by 2.
    28 ranges * 2 = 56 ranges
  3. Using that number, calculate the demand based upon NEC Table 220.55.
    This example will use Column C (rating between 8.75 and 12 kVA). For 56 ranges, the demand is 25 kVA plus 0.75 kVA for each range.
    25 kVA + (0.75 kVA * 56 ranges) = 67 kVA
  4. Divide that number by 2 to calculate the single-phase load.
    67 kVA / 2 = 33.5 kVA
  5. Multiply that number by 3 to calculate the three-phase load.
    33.5 kVA * 3 = 100.5 kVA

The panel schedule footer will display the connected load and number of ranges for each phase, as well as the calculated load, rounded to the nearest integer (in this case, 101 kVA):

Related Articles

Filter by
Post Page
Electrical Training Recording Electrical Training Distribution Equipment (Panels and Transformers) Electrical Customization Video Circuiting Electrical RT Electrical RT General One-Line Diagrams Light Fixtures Calculations Electrical Drafting Electrical General
Sort by

Panel Schedule Customization Example

This video provides an example of how to customize a panel schedule in Design Master Electrical.

8

Balancing Loads on Panels

You can balance the loads on panels using the Move Circuits command.

8

The Circuiting Command

This training video teaches you how to use the Circuiting command in Design Master Electrical.

8

Solar/Photovoltaic Systems in Design Master Electrical

Design Master can’t perform calculations for DC systems like solar arrays, but you can model them as generators to connect the AC side to your system.

0

Ground Wire Is Too Large

If you upsize your conductors, Design Master will automatically upsize your ground in accordance with NEC 250.122(B).

0

Training Recording: New Electrical 8.7 Features

This training video shows you the new features introduced and improvements made in Design Master Electrical 8.7.

0

Products

Electrical for Revit

Electrical for AutoCAD

HVAC for AutoCAD

Photometrics for AutoCAD

System Requirements

Support

Contact Support

Install & Update Instructions

Online Training

Knowledge Base

User Manuals

Tutorials

Release Notes

Downloads

Wish List

Remote Support

Company

About

Customer Stories

Awards

Newsletter

Blog

Pricing

Electrical for Revit

Electrical for AutoCAD

HVAC for AutoCAD

Photometrics for AutoCAD

Free Trial

Electrical for Revit

Electrical for AutoCAD

HVAC for AutoCAD

Photometrics for AutoCAD

866-516-9497
Billing
1010 B Ave S
Edmonds, WA 98020
Sales and Support
1151 Executive Circle, Suite 201B
Cary, NC 27511
support@designmaster.biz

©2001-2022, Design Master Software, Inc