Free Trial Try Design Master for 30 Days

Training Recording: Breaker Curves in Revit

Thursday, March 11th, 2021

Click here for a more recent selective coordination training.

How to set breaker curves for performing selective coordination and calculating arc-flash trip times in Design Master Electrical RT 2.0.

 

We look at the following topics for breaker curves:

We also answer the following questions:

Related Articles

Filter by
Post Page
Training Recording Electrical RT Electrical RT Training Electrical RT General Electrical Electrical Training
Sort by

Training Recording: Electrical RT 2.0 Beta 8 Features

This training video shows you the improvements made in Design Master Electrical RT 2.0 Beta 8.

24

Training Recording: Customizing Families (ft. Brian Muir)

This training video teaches you how to customize your families in Design Master Electrical for Revit, and more. This training was led by Brian Muir, P.Eng., of Muir Engineering.

24

Training Recording: Wire Sizing

This training video teaches you how wire sizing works in Design Master Electrical.

24

Training Recording: Circuit Descriptions

This training video teaches you how to manage circuit descriptions in Design Master Electrical RT.

24

Training Recording: Fault Calculations

Learn about short-circuit analysis in our software. See how we calculate the fault at panels and the factors that impact the outcome.

18

Training Recording: Voltage Drop in Revit

Learn how Design Master calculates voltage drop. Dig in to both the calculations themselves and all the settings that you can adjust.

18